Are there any color restrictions for the roof or dock? ; debris removal; construction and maintenance of ski ramps fixed by temporary mooring devices such as retrievable, conventional anchors; fish havens, fish reefs, fishery enhancement, mariculture and aquaculture activities; construction of noncommerical intake structures; aerial transmission lines and submerged utility lines; maintenance of existing beaches; normal operation and maintenance activities associated with FERC Project No. (a) It is the policy of the Secretary of the Army, acting through the Chief of Engineers, nage the natural, cultural and developed resources of each project in the public interest, providing. Authorizing Work and Activities in the Savannah River Lakes - recreational swim beaches for Lake Hartwell, Lake Russell and Lake Thurmond. RGP 12 Conduct various activities for anadromous salmonid habitat restoration. All new docks( with the exception of all aluminum or similar type construction docks) and roofs must be dark green, black, dark brown or dark gray. Miscellaneous Activities within the Louisiana Coastal Zone: Authorizes the maintenance dredging in oil or gas well channels, canals, and slips. Minor Structures and Work Within the Limits of Georgia Power Company Lakes - Maintenance dredging of existing boat slips, canals, or navigation channels. Authorizes the installation and/or construction of open-pile piers, mooring structures/devices, fender piles, covered boathouses/boat slips, boatlifts, osprey pilings.platforms, accessory pier structures, and certain devices associated with shellfish gardening, for private, commercial, community, and government use. Authorizes activities that are covered in the Santa Clara Valley HCP/NCCP including bridge and culvert removal and repair and installation, sediment removal from creeks, bank stabilization, temporary construction access and dewatering, and minor maintenance of levee, canals, and ditches. For website corrections, write to sas-cco@usace.army.mil, An official website of the United States government, National Environmental Policy Act and Planning Process, Effects Determination Guidance for Endangered & Threatened Species (EDGES), Hosted by Defense Media Activity - WEB.mil. Authorizes structures, work, and/or the discharge of dredge and/or fill material, resulting from activities associated with public infrastructure facilities under the jurisdiction of Harris County Engineering Department (HCED). Authority is delegated to the Savannah District, Operations Project Managers (OPMs) at the above listed Corps' lakes, to verify whether proposed work and activities in waters of the United States would meet the terms and conditions for authorization by these PGPs. Minor Work, Structures, and Discharges of Dredged and Fill Material in Michigan (for docks, seawalls and riprap, dredging, boat hoists/wells/ramps, groins, submerged utilities and water intakes, temporary cofferdams, removal of structures, sand paths, grooming of sand, boardwalks etc.). If dock plans for the subject used dock cannot be located, you must submit engineer approved plans for the dock. Serving lake communities in South Carolina, North Carolina, and North Georgia, specifically, but not limited to, Lake Keowee, Lake Hartwell, Lake Murray, Lake Bowen, Lake Adger, Lake Lanier (NC), Lake Blalock, Lake Greenwood, Lake Wylie and Lake Norman. All permit holders should receive a post card from the Corps informing them of the approval of the 2020 Hartwell Lake SMP with information on how and where to obtain a copy. Authorizes maintenance dredging for the removal of silt accumulations around existing docks, under existing barge fleeting and mooring areas, and within associated access channels and port basins; and the discharge of the dredged material. Property adjacent to Limited Development Areas (aka green areas) with greater than 20 feet of shared boundary line that are non-dockable; have until May 15, 2021, for approval of supporting facilities with installation due by expiration of the shoreline use permit. Authorizing Work and Activities in the Savannah River Lakes - Bank stabilization for Lake Hartwell, Lake Russell and Lake Thurmond. This is the official public website of the Headquarters U.S. Army Corps of Engineers. U.S. Army Corps of Engineers Southwestern Division (SWD) has agreed with TCEQ to continue using the 2000 MOA Section 401 Certification Procedures, including the delegation for Tier I and Tier II projects, only for Corps permit applications received PRIOR to 11 September 2020.All applications received after this date will follow the Clean Water Act Section 401 Certification Rule procedures. If the proposed dock would have at least 4ft. Maintenance Dredging (Excavation) in Blue Ridge, Nottely, and Chatuge Reservoirs-authorizes maintenance dredging of accumulated sediment from previously authorized facilities located in waters of the United States. City of Superior (WI) Special Area Management Plan (SAMP)- Institutional Programmatic General Permit. RGP 89-01-WEH Bank Protection on NE Game & Parks Water Bodies, authorizes breakwater structures, revetments and various types of shoreline stabilization structures, RGP 7-DEN Channel Maintenance and Construction on the South Platte River and Tributariesto the South Platte River Under Authority of Urban Drainage and Flood Control District, authorizes certain channel erosion and protection projects, flood-related fill or excavation activities, other work associated with drainage and flood protection, and repair work for flood-damaged areas performed in waters of the US within the jurisdiction of the Urban Drainage and Flood Control District (UDFCD) in Colorado, RGP 37-DEN Stream Stabilization Projects in Colorado, authorizes stream stabilization activities necessary for erosion control or prevention, such as vegetative stabilization, bioengineering, sills, rip rap, revetment, barbs, jetties, weirs, or combinations of bank stabilization techniques, RGP 2014-01-MTH Yellowstone Mountain Club Development, authorizes activities within the Yellowstone Mountain Club, RGP 14-01-MTH RGP for emergency situations, authorizes dishcarges of dredged or fill material for emergency flood protection reconstruction, and repair work in flood damaged areas, RGP 00-02-MTH for Fish Barriers and fish screens within the state of Montana. Not only is solar a clean, safe energy source, it also minimizes impacts to public lands by eliminating the need to trench-in traditional power lines, Sandy Campbell, natural resources manager at Hartwell Lake, said. You must inform your area ranger when the dock is installed. Solar power eliminates possible shock hazards for swimmers. authorizes structures or fill to permanently or temporarily isolate populations of fish for fish management purposes. Solar power does not require recertification every five years. Do I need to apply for a permit if I plan on installing a boat lift or PWC lift? Portions of the Mississippi River and adjacent port areas within the Vicksburg District in Arkansas, Louisiana, and Mississippi, Regional General Permit -25: Construction of Recreational Boating Facilities. Shoreline Development Activities. Columbia River estuary and main stem, as wll as tributary watersheds (Oregon). Overwater Structures in Southern Lake Chelan, U.S. Forest Service Aquatic Restoration Program, Regional General Permit 41 - Permanent Protection/Repair of Flood Damaged Structures, Damaged Lands and/or Fills (Missouri), Authorizes the excavation or placement of fill material for the permanent protection of and/or the repair of existing flood damaged structures, damaged land areas, and/or damaged fill in Missouri, Regional General Permit 34- Sand and Gravel Excavation Activities (Missouri), Authorizes the discharge of dredged and/or fill material related to mechanical sand and gravel excavation in Missouri, Regional General Permitc 4- Private Boat Docks (Missouri), Authorizes work for the construction of private boat docks in Missouri, Regional General Permit 44 - Maintenance of Public Stormwater, Sanitary, and Combined Sewer Systems (Missouri), Authorizes sediment and debris removal, maintenance of existing stormwater conveyances or basins in Waters of the United States (WOUS), improvements to existing stormwater management facilitites, maintenance or repair of existing stormwater, sanitary, or combined sewer systems in WOUS, maintenance and repair of existing access roads and ramps, and vegetation removal in Missouri, Regional General Permit 16- Bank Stabilization (Illinois). Shoreline shall be construed as fee simple property owned by the U.S. Government and managed by the Corps of Engineers (described as "government property" in this document), whether or not it is covered by water. RGP 26 Port of Oakland - Maritime Facilities Maintenance. Waters of the US utilized as stormwater management facilities under the authority fo the HCFCD, Harris Co, TX, SWG-2010-00605 - Texas General Land Office (TxGLO). A field appointment with a Corps ranger can be scheduled to answer any questions you may have concerning public property and our Lakeshore Use Permit Program. Public Transportation Projects - Temporary access, bypass, dewatering, and other temporary structures and fills, including cofferdams, which are necessary to maintain, repair, rehabilitate, replace, improve, widen, and construct roads, bridges, culverts, and associated structures. NWP-2007-999/5, General Permits forSan FranciscoDistrict. Authority is delegated to the Savannah District, Operations Project Managers (OPMs) at the above listed Corps' lakes, to verify whether proposed work and activities in waters of the United States would meet the terms and conditions for authorization by these PGPs. Live Rock and Marine Bivalve Aquaculture: to deposit materials for the purpose of live rock and marine bivalve aquaculture as well as related activities such as seeding, rearing, cultivating, transplanting, and harvesting activities in navigable waters of the United States within the jurisdiction of the State of Florida (i.e. 2017-01776/South Carolina Department of Natural Resources Oyster Restoration General Permit. Authorizes regulated activities conducted in accordance with all applicable terms and conditions of the Utility Regional General Permit (RGP or permit) in the States of Wisconsin and Minnesota and on Indian Reservations in Wisconsin and Minnesota. Recreational Dock Facilities in Tidal Waters -Corps delegates authority to the Georgia Department of Natural Resources, Coastal Resources Division. RGP 5 Conduct protection activities under emergency situations. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Construction and maintenance of boat ramps. Filling of Previously Dredged Areas Such as Boat Slips, Artificial Canals, etc. All plans for new docks and modifications to existing docks, including walkways, must be approved by a state licensed structural engineer to ensure a quality, safe design suitable for conditions on the Hartwell Project. NWP-2011-127-1. Public Transportation Projects -Construction of roads, culverts, bridges, and other structures or fills associated with improvements to all existing public transportation projects and/or with all new public transportation projects. Abandoned Mined Land Reclamation Projects. This is the official public website of the Headquarters U.S. Army Corps of Engineers. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Maintenance of existing beaches. RGP must be activated for a specified timeframe and area by the District Commander, 2016-00761/South Carolina Dock General Permit. Authorizes oil and gas development within a portion of the High Island Oil Field. On the current schedule of fees, a new permit is $400 and $175 for a permit renewal.. The Corps strives to make its permit decisions in a timely manner that minimizes impacts to the regulated public. At Master Docks we provide high quality custom aluminum and steel docks and lifts at great competitive prices for the Lake Hartwell area. Authorizes bank stablization activities including those approved by Illinois Department of Natural Resources, Office of Water Resources. 9 nautical miles and Mean High Water Line). This new requirement will begin for permits authorizing electrical service expiring on or after February 1, 2021. Authorizes placement of dredged or fill materials impacting a cumulative maximum of 10.0 acres of wetlands identified for institutional development in accordance with the City of Superior Special Area Management Plan (SAMP) and City of Superior zoning code or ordinances. authorizes the construction of new boat ramps, the expansion, extension and modification of existing boat ramps, construction of transfer walls and docks to service boat ramps, and protective fills immediately adjacent to proposed and existing ramps. Authorizes HCFCD to conduct work and place dredged and/or fill materials for the purpose of routine maintenance and emergency repair of existing storm water management facilities. Issued jointly with other Missouri Districts. Authorizesall County, local city and town, and Tribal government entities within Pima County to conduct various maintenance and bank stabilization activities. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Bank stabilization and cross-over walks. Authorizes certain activities associated with the maintenance of existing drainage ditches in tidal and other navigable waters, NAO 18-RGP-17 - Work in Navigable waters for Private use (Non-Reporting). 659; as established under the terms and conditions of the November 28, 2008, license, as amended from time to time; and signals, lighting, navigational features including devices in accordance with guidance and regulation of the U.S. Coast Guard or Georgia Department of Natural Resources. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Construction and/or maintenance of boat shelters, gazebos, hoists, and shelters. Projects by the state to address safety and environmental hazards. storm debris, downed trees, and log rafts) for the purposes of maintaining drainage, (Staten Island "Blue Belt" extended stormwater detention facilities), structures and work in artificial tidal lagoons and access channels, NAO 19-RP-01 - Virginia Department of Transportation roadway and railway projects. This information is collected and maintained at project offices and is used as a basis for issuing . Highways, and Interstate Highways. 3 Bank Protection of Cultural Sites. description of the activity is needed to assure conditions of the permit . 2017-00835/Managed Tidal Impoundment General Permit. Issued jointly with other Missouri Districts. Built by the U.S. Army Corps of Engineers between 1955 and 1963, the authorized purposes are. and other minor discharges of fill material for new structures as necessary. 659 licensed under the Federal Power Act (16 U.S.C. The minimum size dock allowed is 200 square feet with no one side being less than 10 feet. authorizes SD dept of game, fish, and parks, to conduct bank stabilizations to prevent destruction of culturally significant sites. Vicksburg District boundaries within Arkansas, Louisiana, and Mississippi, Regional General Permit -16 Maintenance Dredging Activites on the Missisippi River. Construction of pile-supported single family, multi-family, and single piers used at lodging facilities. RGP 8202-07-RWY 198226002, Version 6 Fish habitat enhancement and restoration in Wyoming waters, authorizes the construct fish habitat enhancement and restoration features in creeks, streams, and rivers in the State of Wyoming, RGP 9202-06-RWY 199222002, Version 6, Construction and modification of boat ramps in Wyoming. Authorizes the Santa Cruz County Resource Conservation District and private land owners in implementing habitat resoration and conservation practicies implement under the SCCRCD. Some homeowners have provided names of electricians they used, and are State Certified, and the cost of their inspection. I want to purchase a used dock that is already permitted on Hartwell, what do I need to do? Seminole Tribe of Florida-Brighton: discharge of fill material on the Brighton Seminole Indian Reservation (BSIR) for the following minor activities: single family home sites, utility lines, recreational facilities, boating, agricultural use, commercial use, government facilities, water control activities, ditch maintenance, and road construction. SWG-2009-00123 - Harris County Flood Control District (HCFCD). Authorizes activities which are granted Shoreline Use Permits or Special Use Licenses located in or over the Mississsippi River. Authorizes work associated with construction, expansion, modificaiton, or improvement of linear transportation projects that result in impacts up to 1 acre of WOUS. c. Maximum number of receptacles on dock is two single or one duplex. subject to verification in writing by the Crisp County Power Commission (CCPC) in accordance with CCPC's Lake Blackshear Shoreline Management Plan for Lake Blackshear Project No. Programmatic Regional Permit-60: Minor Construction Activities on Entergy-Owned Arkansas Hydropower Lakes; Lake Catherine and Lake Hamilton. Authorizes placement of dredged or fill materials impacting a cumulative maximum of 15.0 acres of wetlands identified for public facilities in accordance with the City of Superior Special Area Management Plan (SAMP) and City of Superior zoning code or ordinances. Permit triggered by national or state flood disaster declarations for recovery and restoration activities. NAO 18-RGP-18 - Work in Navigable waters for commercial and Institutional use (Reporting). Construction/Installation/Repair/Maintenance of the following: Piers, floating docks (including joint use and community) boat/jet ski lifts, mooring piles, dolphins, covered boats sheds and dock covers for private use. b. Can I enclose my dock? Regional General Permit 33 - Conservation Practices Sponsored by Natural Resources Conservation Service (NRCS)/Housing and Urban Development (HUD), Authorizes activities in Waters of the United States associated with specific United States Department of Agriculture (USDA) NRCS and HUD-sponsored activities which do not qualify for the CWA 404(f)(1) exemptions in the State of Iowa, Regional General Permit 34 - Iowa Conservation Reserve Enhancement Program. 2017-00760/South Carolina Department of Natural Resources General Permit: 2017-00761/South Carolina Department of Natural Resources General Permit, 2017-00762/South Carolina Department of Natural Resources General Permit, 2017-00763/South Carolina Department of Natural Resources General Permit, 2017-00764/South Carolina Department of Natural Resources General Permit, Wetland and Stream Restoration/Enhancement, 2017-00765/South Carolina Department of Natural Resources General Permit, 2017-00766/South Carolina Department of Natural Resources General Permit, 2017-00767/South Carolina Department of Natural Resources General Permit, 2017-00768/South Carolina Department of Natural Resources General Permit, 2017-00769/South Carolina Department of Natural Resources General Permit, 2017-00770/South Carolina Department of Natural Resources General Permit, 2015-01280/South Carolina Department of Transportation Linear Transportation General Permits, South Carolina Department of Transportation Projects, 2015-01281/South Carolina Department of Transportation Linear Transportation General Permits, 2015-01282/South Carolina Department of Transportation Linear Transportation General Permits, 2015-01283/South Carolina Department of Transportation Linear Transportation General Permits, Roadway Improvements (to include shoulder improvements, addition to bike lanes, sidewalks or multi-use paths, etc. Private Boat Docks. The U.S. Army Corps of Engineers, South Atlantic Division has announced that administrative dock fees for Lake Hartwell and nine other lakes in the Southeast will increase to $835 for. ****In response to COVID 19, visitors to Corps-operated recreation areas are encouraged to follow current CDC guidelines regarding masks and social distancing. The 2020 Hartwell Lake SMP and summary chart highlighting the changes and the associated Environmental Assessment can be viewed and downloaded at: https://go.usa.gov/xEt5j. Authorizes work associated with construction, expansion, modificaton, or improvement of linear transportation projects that result in impacts up to 1 acre of Waters of the United States (WOUS). Authorizes annual channel maintenance within sections of the Salinar Riverincluding sediment removal, construction of secondary channels, and vegeation management. All navigable waters in the Galveston District, excluding waters in Louisiana. 706-856-0300 or toll free at Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Submerged irrigation lines in Navigable Waters of the United States. A, RGP 00-05-BIS Amendment No. Aerial Tansmission Lines in Florida: general authority is hereby given for activities required for the installation, construction, maintenance, replacement, and repair of aerial transmission and distribution lines over all waters of the United States (WoUS) in the State of Florida. Authorizing Work and Activities in the Savannah River Lakes - debris removalfor Lake Hartwell, Lake Russell and Lake Thurmond. Typical activities include construction of boat ramps, parking areas, access roads, fishing piers, docks (both fixed and floating) and associated facilities. Mississippi Department of Transportation sponsored highway projects within the State of Mississippi, dock activites on Lake Pend Oreille in Idaho, Boat Ramps and associated piers, docks and structures, Construction Activities in Coastal Counties, Dredge and Discharge into Federally Authorized Navigation Channels, Charlotte Stormwater Services (Permittee), NC DOT Bridge, Interchange and Road Widening Projects, NC DOT Road Widening Projects (Merger projects only). Deliver vital engineering solutions, in collaboration with our partners, to secure our Nation, energize our economy, and reduce disaster risk. ), 2015-01286/South Carolina Department of Transportation Linear Transportation General Permits, Cleaning and Repairing Existing Outfalls and Roadway Ditches, 2016-00094/Savannah Rivers and Lakes South Carolina, South Carolina Lakes: Hartwell, Russell, Thurmond, 2016-00095/Savannah Rivers and Lakes South Carolina, 2016-00096/Savannah Rivers and Lakes South Carolina, 2016-00097/Savannah Rivers and Lakes South Carolina, Fish Attractors, Reefs, Fishery Enhancement Activities, 2016-00098/Savannah Rivers and Lakes South Carolina, 2016-00099/Savannah Rivers and Lakes South Carolina, 2016-000100/Savannah Rivers and Lakes South Carolina, 2016-00101/Savannah Rivers and Lakes South Carolina. Missouri. Authorizing Work and Activities in the Savannah River Lakes - dock anchors for Lake Hartwell, Lake Russell and Lake Thurmond. Hartwell Dam & Lake Guidelines For General Uses Of Hartwell Lake Public Lands - Including The Types Of Private Uses And Activities Which May Be Permitted (Such As Boat Docks And. RGP 4 Conduct various Mosquito abatement activities. Galveston District - Harris County, Texas, SWG-1994-00026 - Texas Parks and Wildlife Department (TPWD). Must be in weatherproof receptacle boxes with self-closing caps. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Maintenance dredging of less than 5,000 cubic yards of accumulated material from existing docking or berthing areas. Authorizes the discharge of dredged or fill material and other work associated with emergency restoration, repair, or reconstruction measures performed in Waters of the United States (WOUS) in the State of Illinios as a result of damages recently incrred during flooding. Also, this updated SMP incorporates information provided by residents, state agencies and others to set a more sustainable path for managing public land surrounding the lake, said Aaron Wahus, Operations Project Manager. 5625 Anderson Hwy Private Recreational Ponds - Construction and maintenance of private (non-commercial), recreational ponds with a full pool surface area of less than five acres. Dock Permit Coordinator Georgia Department of Natural Resources Coastal Resources Division One Conservation Way Brunswick, GA 31520 AND Commander, Savannah District US Army Corps of Engineers ATTN: CESAS-RD 100 W. Oglethorpe Avenue Savannah GA, 31401 For general questions about dock permits, the status of a pending application, see our web page Minor Activities in the Okeechobee Waterway: placement of riprap revetments, maintenance dredging, maintenance of boat slips, boat ramps, and construction of bulkheads, installation and/or maintenance of aerial and subaqueous transmission lines, construction of minor structures, construction and/or maintenance of single-family mooring facilities (i.e., docks and piers), construction and/or maintenance of private multi-family mooring facilities (docks and piers) having a surface area of 1,000 square feet or less. Authorizes work, structures and/or fill associated with certain Virginia Department of Transportation roadway and railway projects. Please keep your mailing address and phone numbers current. Hartwell, GA 30643-5259 2. Authorized structures associated with piers shall include boat morring facilities, hoists and normal apurtenances such as stairways, fish cleaning tables and walkways. 791 et seq.) RGP 25 City of Livermore Stream Maintenance Project. Lee, Glades, Hendry, Okeechobee, Martin County, Florida, Live Rock Aquaculture in the Exclusive Economic Zone (EEZ) of Florida: to deposit materials for the purposes of live rock aquaculture into the Exclusive Economic Zone (EEZ), Ten Activities on Miccosukee Tribe Reservation Lands: up to 1.0 acre of fill for residential and 2.0 acres of fill for institutional.