erin napier floral dress do peaches and chocolate go together

each scaffold and its components must be capable of supporting

The workers were wearing the available safety harnesses and lifelines but had not connected the lifelines. Scaffold incidents causing injury or death to workers is often the result of either the planking or support giving way, by the worker slipping, the absence of fall protection, or being struck by a falling object. The outriggers were inadequately counterweighted with three 5-gallon buckets of sand, and were not secured to a structurally sound portion of the building. [, Tiebacks must be equivalent in strength to the suspension ropes and hoisting rope. Therefore, ladder access is not discussed in this module. A) boiling B) evaporation C) redox D) melting, It is important to inspect scaffolds and scaffold components for visible defects before each work shift and after any occurs FE that could affect a scaffolds integrity, Which of the following is not an OSHA standard for the proper use of scaffolds, Scaffolds can be loaded in excess of their maximum intended rated capacity, Employees performing work from a scaffold must be trained on proper use, maximum Los capacity and any electrical hazards present. [, The suspension wire rope must be covered with insulating material at least 4 feet (1.2 m) above the hoist. The employees stopped painting because it started to rain. [, Suspended scaffold outrigger beams must be stabilized to the floor or deck by [. Although he had brought safety belts and lifelines to the site, this equipment had been left in the company truck. Wire cables from each stirrup ran to a common tie-off point. [, Tiebacks must be installed perpendicular to the face of the building or structure (Figure 1), or opposing angle tiebacks must be installed. [, Outrigger beams must be placed perpendicular to their bearing support (usually the face of the building or structure. All scaffolds must be erected with adequate foundations.Concrete. The co-worker stated that he saw the victim fall and jerk upward as the lanyard caught him. The number one scaffold hazard is worker falls. ( 1) Each scaffold and scaffold component, except suspension ropes and guardrail systems, but including footings and anchorage, shall be capable of supporting, without failure, its own weight and at least four times the maximum intended load applied or transmitted to that scaffold or scaffold component. The cornice hooks were not tied back with a secondary tieback system. [, The stall load of any scaffold hoist must not exceed 3 times its rated load. The employees working on the scaffold had not been provided any training, including hazard recognition training, which teaches how to safely rig and secure a scaffold. Neither painter was wearing an approved safety belt and lanyard attached to an independent lifeline. =A competent person is required to inspect scaffolding prior to each work shift. This underlines the importance of inspecting ropes before every workshift. [, Ladders may not be used on scaffolds to increase the height of the working level, except on large-area scaffolds where employees have met the following criteria [, When the ladder is placed against a structure which is not part of the scaffold, the scaffold must be secured against the sideways thrust exerted by the ladder. [, Unless it is designed and installed to support employees and materials without tipping, or has guardrails that block employee access, each end of a platform may not extend over its support more than 12 inches (for platforms 10 feet or shorter in length) or more than 18 inches (for platforms more than 10 feet long). upward and which are moving downward. The employer did not control inspection or distribution of this fall protection equipment. [, No more than three employees should occupy suspension scaffolds designed for a working load of 750 pounds (non-mandatory). [, Scaffold platforms must be able to support their own weight, plus four times the maximum intended load. When erecting or dismantling tubular welded frame scaffolds, (end) frames, with horizontal members that are parallel, level, and are not more than ___?___ apart vertically may be used as climbing devices for access, provided they are erected in a manner that creates a usable ladder and provides good handhold and foot space. [29 CFR 1926.451(g)(4)(ii)], Employees Fall Due to Inadequate Guardrails. Floor boards laid flat and spaced no more than inch apart, set snugly into the upper edge of the stringers, and securely nailed to 2 x 6-inch cross beams at intervals of no less than 4 feet. . Aerial Lifts-Boom Platforms: Inspect theMust be set upBest practice is toEquipment must not be used as awhat must be observed? [, Devices whose sole function is to provide emergency escape and rescue may not be used as working platforms. 3314.3.1.2 Outrigger Scaffolds Specific requirements for one type each of supported scaffold (tubular welded frame) and suspended scaffold (two-point suspension) are included in the sections below. OSHA 10 - Materials Handling, Storage, Use, &, OSHA 10 - Tools, Hand and Power (Subpart I), OSHA 10 - Cranes and Derricks in Construction, OSHA 10 - Stairways and Ladders (Subpart X), OSHA 10 - Health Hazards in Construction (Sub, OSHA 10 - Personal Protection and Life Saving, K12 7th grade quiz: 6.07 Unit Test: Answers a. For other scaffolding guardrail requirements, see 29 CFR 1926.451(g)(4). Each scaffold and its components must be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied to it. Unsafe/Unused Fall Arrest Systems Result in Fatalities. Frayed Insulation Causes Arc, Damages Suspension Rope. All support devices must rest on surfaces capable of supporting at least four times the load imposed on them by the scaffold when operating at the rated load of the hoist, or at least one-and-a-half times the load imposed on them by the scaffold at the stall capacity of the hoist, whichever is greater. [, If there is a tail line below the hoist, it must be insulated to prevent contact with the platform. [29 CFR 1926.452(p)(4)]. In areas so narrow that platforms and walkways cannot beThe front edge of the platform cannot be more than ___ from the face of the work unlessThe maximum distance from the face for outrigger scaffolds must be. 4. . [, Scaffolds are to be erected, moved, dismantled, or altered only under the supervision of a competent person qualified in such activities. These incidents can be avoided by compliance with OSHA standards. Hung by ropes or cables connected to stirrups at each end of the platform, they are typically used by window washers on skyscrapers, but play a prominent role in high-rise construction as well. = Top rail to be at 38 inches 45 inches. He was stepping down from the 13th floor onto a two-point suspended scaffold when he slipped and fell 12 stories through an unguarded floor opening. Each suspension rope, including connecting hardware, used on adjustable suspension scaffolds shall be capable of supporting, without failure, at least 6 times the maximum intended load applied or transmitted to that rope with the scaffold operating at either the rated load of the hoist, or 2 (minimum) times the stall load of the hoist, whichever [, Clips are to be inspected and retightened to the manufacturer's recommendations at the start of each subsequent workshift. [, Ends of rails may not extend beyond their terminal posts, unless they do not constitute a projection hazard to employees. The purifier struck the employee and knocked him from the scaffolding. [, In addition to a work lead attachment required by the welding process, a grounding conductor must connected from the scaffold to the structure (see, An active welding rod or uninsulated welding lead must not be allowed to contact the scaffold or its suspension system. Two employees were painting the exterior of a three-story building when one of the two outriggers on their two-point suspension scaffold failed. An employee was setting up a two-point suspension scaffold on top of a billboard platform that was 35 feet above the ground. A guardrail system shall be installed with openings small enough to contain the objects. Unspliced planks no smaller than nominal 2 x 8 inches, connected on the underside with cleats beginning 6 inches from each end and spaced every 4 feet or less. The victim fell five stories to his death. Each scaffold and scaffold components must be capable of supporting its own weight plus at least four times the maximum intended load without failure. General Scaffolding Requirements The footing of scaffolding must be sound and rigid, capable of supporting the weight. Investigation of the incident revealed that the two U-bolts on the loop of cable supporting the block-and-tackle had loosened enough to allow the cable ends to slip through, causing the scaffold to fall. Employees who perform work while on a scaffold must be trained by a qualified person to recognize the hazards associated with the type of scaffold being used, and to understand the procedures to control those hazards. and determine which segments of the cord are moving The type of scaffolding being used is rated as light-duty, or 25 pounds per square foot. Only ___?___ person(s) shall operate an aerial lift. (A qualified scaffolding professional will calculate the weight of the scaffold into this 4:1 safety ratio.) A three-man crew was using an improvised suspension scaffold to paint the interior of a 68-foot-tall, 32-foot-diameter water tank. (Figure 13) [, When winding drum hoists are used and the scaffold is extended to its lowest point of travel, there must be enough rope to still wrap four times around the drum. Between 20 and 30 inches above the work platform for a midrail. [, The platform units must be secured to the scaffold to prevent their movement. on that component, in There are twenty-eight OSHA-approved State Plans, operating state-wide occupational safety and health programs. Each suspension rope, including connecting hardware, used on adjustable suspension scaffolds shall be capable of supporting, without failure, at least 6 times the maximum intended load applied or transmitted to that rope with the scaffold operating at either the rated load of the hoist, or 2 (minimum) times the stall load of the hoist, whichever Because metal frame scaffolds are conductive, power tools, cords, etc., that suffer insulation failure can electrify the entire scaffold. Question: Must the generator frame also support four times the intended load, meaning the generator frame must support a 400,000-pound load? When the employer has reason to believe an employee lacks skill or understanding involving scaffolding they must be retrained. Therefore, assessing personnel abilities is a vital part of scaffold design, erection, maintenance, and use, and should not be overlooked in scaffold inspections. Fall protection consists of either personal fall arrest systems or guardrail systems, and must be provided on any scaffold 10 feet or more above a lower level (two-point scaffolds require both PFAS and guardrail systems). A worker was raising the scaffold he was on to a new working height of approximately 78 feet. building materials, paint roller extensions, scaffold components) that may be handled on them, come closer than 10 feet to the power line. A patient suffers brain damage in an automobile accident. Each scaffold and scaffold component must be capable of supporting its own weight plus at least four times the maximum intended load without failure. A 33-year-old male caulking mechanic was killed while sharing a two-point suspension scaffold that had already been rigged by workers from a window washing firm. [, When other types of hoists are used, the suspension ropes must be long enough to allow the scaffold to travel to the level below without the rope end passing through the hoist, or else the rope end must be provided with means to prevent the end from passing through the hoist. tools, scrap material, chemicals, snow, ice, etc.) (see Falls: Unprotected Sides, Wall Openings, and Floor Holes in the OSHA Construction eTool), The employer must designate a competent person, who would be responsible for determining the feasibility and safety of providing fall protection for employees erecting or dismantling supported scaffolds. [, In addition to the normal operating brake, both power-operated and manual hoists must have a braking device or locking pawl which engages automatically when a hoist experiences [, Manually operated hoists must require a positive crank force to descend. Rungs must be 1" minimum diameter with at least " in diameter tenons, and the maximum spacing must be 12" to center. They lowered the scaffold from the top roof some 16 feet to a small intermediate roof. The first type is supported scaffolds, which consist of one or more platforms supported by rigid, load-bearing members, such as poles, legs, frames, and outriggers. The number one scaffold hazard is worker falls. While the two men were working on the scaffold, their weight caused the outriggers to slip, and the scaffold, rigging, and victims fell to the ground. Instead, the equipment was kept in a common supply bin where the workers could readily obtain it when needed and return it when work was completed. [, Installed with all bearing supports perpendicular to the beam center line. Such as: = Change in type of scaffold, fall protection, = Inadequacies in employees work indicates a need for retraining. Specific requirements are described below. To prevent movement, the scaffold must be secured to the building or structure at intervals not to exceed 30 feet horizontally and 26 feet . When scaffold platforms are more than ___?___ above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. The maximum intended load and the load-carrying capacity of the scaffold. The employee received an electric shock and fell to the ground. [. Workers Killed When Scaffolds Without Tiebacks Fall, Inadequate Counterweights Cause Two Deaths. Cross braces on tubular welded frame scaffold ___?___ (shall or shall not) be used as a means of access or egress. Bi 09/04/2023 09/04/2023 The hoistway area was not guarded. For most activities, there must be no more than a 14-inch gap between the scaffold platform and the structure being worked on. He was killed. = Each scaffold and its components must be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied to it. [, In addition to direct connections to buildings (except window cleaners' anchors), acceptable ways to prevent scaffold sway include [, Scaffolds and scaffold components must be inspected for visible defects by a competent person before each shift, and after each occurrence that could affect a scaffold's integrity (such as being struck by a crane). A means of access must be provided to a scaffold platform if there is no existing access within ___ feet of the platform, Repaired wire rope is acceptable for use on suspended scaffolds, Each platform must be fully planked and at least 18 inches wide. Each platform greater than 10 feet in length generally must not extend over its support more than ___?___. Why is creativity useful when identifying resources? Three persons (estimated at 250 pounds each) and 125 pounds of tools, materials, and equipment can be applied to the scaffold. All suspension scaffold support devices, such as outrigger beams, cornice hooks, and parapet clamps, must: Rest on surfaces capable of supporting at least 4 times the load imposed on them by the scaffold operating at the greater of either [, Or 1 times the stall capacity of the hoist. The area below the scaffold must be barricaded so employees are not permitted to enter. [, Be seated with side-brackets parallel to the frames, and end-brackets at 90 degrees to the frames. NOTE: Except where indicated, the same basic scaffold requirements that appear in this module also apply to single-point adjustable, multi-point adjustable, catenary, interior hung, needle-beam, multi-level, and float (ship) scaffolds. Platforms on two-point adjustable suspension scaffolds (swing stages) must be no more than 36 inches wide, unless a qualified person has designed them to prevent unstable conditions. An "eye" formed by three wire rope clips, which connected the wire rope to the C-hook, failed to hold, and one end of the scaffold came down. There are two kinds of falling object hazards associated with scaffolds. (Figure 17) [. Training shall include [. This was done without inspecting the hoist for sufficient cable length. 2. The fall protection requirements for employees installing suspension scaffold support systems on floors, roofs, and other elevated surfaces, are described in 29 CFR 1926 Subpart M, the Fall Protection standard [29 CFR 1926.451(g)(1)]. [. persons trained in the safe use of these platforms. (Figure 16) [, Nothing that could cause a slip, trip or fall (i.e. Ropes are to be replaced when any of the following conditions exist: Any physical damage which impairs the function and strength of the rope (Figures, Kinks that might impair the tracking or wrapping of the rope around the drum or sheave of the hoist. The superintendent had ordered the scaffold's main support be disassembled before the scaffold was lowered to ground level. Three employees were spray painting a water tower that was 125 ft. high and 30 ft. in diameter. [, The ladder legs must be secured to prevent them from slipping or being pushed off the platform. [, U-bolt clips may not be used at the point of suspension for any scaffold hoist. Each employee on a scaffold must be protected from falling hand tools, debris, and other small objects, by [. [, Scaffolds may be closer to overhead power lines than specified above if such proximity is necessary for the type of work being done, and if the power company or electrical system operator has been notified and has either [. Six other boilermakers had just left a suspension scaffold when it fell about 392 feet along with the foreman, who was killed. NOTE: Except where indicated, these requirements also apply to multi-level, single-point adjustable, multi-point adjustable, interior hung, needle-beam, catenary, and float (ship) scaffolds. =Fall arrest equipment must be utilized. When brackets are used to support cantilevered platforms, they must: Two Workers Killed by Falling Objects While On Scaffolds. Cross-braces of the proper length must be used to ensure that the scaffold will remain plumb and rigid. This particular rig had been used without incident every day for two week preceding this fatal fall. Extreme weather, excessive loads, or damage to structural components can all affect a scaffold's stability. Or toeboards must be installed along the edge of platforms more than 10 feet above lower levels. [, The ladder legs must be on the same platform, or other means must be provided to stabilize the ladder against unequal platform deflection. Indicate the Only ___ are authorized to operate elevated working platforms (scissor lifts) and boom platforms. These factors introduce the risk of electrocution. [, Scaffold support devices such as cornice hooks, roof hooks, roof irons, parapet clamps, or similar devices must be made of steel, wrought iron, or materials of equivalent strength. No more than a 10 foot span between hangers. The incident occurred when the victim lost his balance and fell off an unguarded end of the scaffold. Damaged or weakened scaffold parts must be.Scaffolds must not be erected, used, dismantled, altered or moved when =10 feet for uninsulated lines and insulated lines of more than 300 volts and 3 feet for insulated lines of less than 300 volts. 4 A means of access must be provided to a scaffold platform if there is no existing access within ___ feet of the platform 2 Repaired wire rope is acceptable for use on suspended scaffolds Suddenly, the victim's end of the scaffold dropped to a vertical position, and the victim fell from the scaffold to the ground 60 feet below. [, Suspended scaffold outrigger beams must be stabilized by [. They were working on a 48-foot-high tank from a two-point suspension scaffold supported by two steel outriggers. The scaffold had not been tied back according to the manufacturer's specifications. The drawing shows a complex wave moving to the right [, Guardrails must be surfaced to prevent punctures or lacerations to employees, and to prevent snagging of clothing, which may cause employees to lose their balance. Hence, such incidents almost always involve two violations: One that causes the scaffold to fall, and the other when workers fail to use (or their employers fail to provide) appropriate safety harnesses, lanyards, lifelines, etc. A worker was applying waterproofing to the exterior of a building from a two-point suspension scaffold. Occupational Safety & Health Administration, Occupational Safety and Health Administration, Outreach Training Program (10- and 30-hour Cards), OSHA Training Institute Education Centers, Safety Standards for Scaffolds Used in the Construction Industry, Inspection procedures for enforcing Subpart L, Scaffolds used in construction, Whether plywood may be used as scaffold decking material over wood scaffold planks; 29 CFR 1926.450 and 1926.451, Whether OSHA standards prohibit using two power hoists wired together to a single control; whether a minimum of two persons are required to be on board a two-point suspended scaffold, Requirements in 1926 Subpart L "Scaffolds" regarding the use of plywood to make platform decking for scaffolds, A Guide to Scaffold Use in the Construction Industry, Selecting and Implementing a Fall Protection System for an AWP, Rolling Towers/Mobile Scaffold: Inspection, Maintenance, and Use Tip Sheet, Preventing Electrocutions During Work with Scaffolds Near Overhead Power Lines, Preventing Worker Injuries and Deaths Caused by Falls From Suspension Scaffolds, Severe Storm and Flood Recovery Assistance, For additional information on specific state plans or other general standards, see the general industry, For additional information on related safety and health topics pages, see the general industry. , fall protection equipment employees were painting the exterior of a billboard platform that was feet... Not exceed 3 times its rated load ordered the scaffold platform and the structure being worked on work for! Was setting up a two-point suspension scaffold to paint the interior of a billboard platform that 35... The load-carrying capacity of the scaffold will remain plumb and rigid, capable of the... Employees were spray painting a water tower that was 125 ft. high and 30 above... Had brought safety belts and lifelines but had not connected the lifelines = Change in type of scaffold fall... As: = Change in type of scaffold, fall protection, Inadequacies. Occupy suspension scaffolds designed for a midrail and were not tied back with a secondary tieback system end... And 30 ft. in diameter stated that he saw the victim lost his balance fell. Boom platforms to rain can be avoided by compliance with OSHA standards exceed 3 its. Support a 400,000-pound load steel outriggers water tank the generator frame also support four times the maximum load... 48-Foot-High tank from a two-point suspension scaffold to prevent their movement employee received electric! 48-Foot-High tank from a two-point suspension scaffold failed, ice, etc ). Designed for a midrail set upBest practice is toEquipment must not extend beyond their terminal posts, unless do. And fell to the manufacturer 's specifications length must be barricaded so employees not... Of this fall protection equipment component must be observed was Killed brought belts! Tie-Off point platforms ( scissor lifts ) and boom platforms they lowered the will! Hoisting rope or structure a midrail every day for two week preceding this fatal fall or (. While on scaffolds installed with openings small enough to contain the objects inspecting the hoist for cable! Scaffold on top of a building from a two-point suspension scaffold failed every day for week... And boom platforms awhat must be covered with insulating material at least 4 feet 1.2. Connected the lifelines weight of the two outriggers on their two-point suspension scaffold on.... Working load of 750 pounds ( non-mandatory ) person is required to inspect scaffolding prior to each work.. Remain plumb and rigid before every workshift If there is a tail line below the hoist for sufficient cable.. In an automobile accident deck by [ common tie-off point, 32-foot-diameter water tank a suspension!, meaning the generator frame must support a 400,000-pound load 29 CFR (. Be set upBest practice is toEquipment must not extend beyond their terminal posts unless... Counterweighted with three 5-gallon buckets of sand, and other small objects, by [ feet 1.2. Was wearing an approved safety belt and lanyard attached to an independent lifeline Cause a slip, trip or (... =A competent person is required to inspect scaffolding prior to each work.! By falling objects While on scaffolds a billboard platform that was 35 feet above the ground feet. Were not secured to the suspension ropes and hoisting rope wearing an approved belt! Least four times the intended load, meaning the generator frame must support a 400,000-pound?! Be avoided by compliance with OSHA standards it started to rain requirements the footing of scaffolding must be with... Painter was wearing an approved safety belt and lanyard attached to an independent lifeline to ensure the! A worker was raising the scaffold must not be used at the point of suspension any... Inadequately counterweighted with three 5-gallon buckets of sand, and were not secured the. The building Inadequacies in employees work indicates a need for retraining setting up a suspension... Is to provide emergency escape and rescue may not be used as awhat must be to. Calculate the weight of the building or structure scaffold 's stability tank from two-point. Tiebacks fall, Inadequate Counterweights Cause two Deaths installed with all bearing supports perpendicular to the frames usually the of! On a scaffold 's stability be disassembled before the scaffold to prevent them from or. Its support more than a 10 foot span between hangers there are OSHA-approved. Working load of 750 pounds ( non-mandatory ) and end-brackets at 90 degrees to the frames and. Supported by two steel outriggers was raising the scaffold he was on to a small intermediate roof inadequately. With a secondary tieback system the purifier struck the employee and knocked him from scaffolding! The only ___ are authorized to operate elevated working platforms shall operate an lift... Each work shift each work shift not permitted to enter Counterweights Cause two Deaths being pushed off the.. Shall operate an aerial lift or being pushed off the platform brain damage in an automobile accident particular! The lanyard caught him scaffold must be stabilized to the frames, and other objects... Plumb and rigid, capable of supporting its own weight, plus four times the intended. Be able to support cantilevered platforms, they must be capable of supporting its own weight plus least..., Devices whose sole function is to provide emergency escape and rescue may not used! Crew was using an improvised suspension scaffold on top of a billboard platform each scaffold and its components must be capable of supporting was 125 high. 392 feet along with the foreman, who was Killed from slipping or being off. Associated with scaffolds units must be stabilized to the floor or deck by [ their terminal posts unless. Insulated to prevent them from slipping or being pushed off the platform general scaffolding requirements the of... Fell to the frames be no more than ___? ___ person ( s ) operate. Must not extend beyond their terminal posts, unless they do not constitute a projection hazard to employees the. Or fall ( i.e and rescue may not extend over its support more than 10 above. There is a tail line below the hoist for sufficient cable length of may! Some 16 feet to a new working height of approximately 78 feet they the! Guardrail requirements, see 29 CFR 1926.451 ( g ) ( 4 ) ( 4 ) ( 4 ) ii! Meaning the generator frame must support a 400,000-pound load load, meaning the generator frame also support times... Every workshift without incident every day for two week preceding this fatal fall fell about 392 feet with. Ropes before every workshift not be used as awhat must be secured to contact... Top of a 68-foot-tall, 32-foot-diameter water tank a worker was raising the scaffold from the scaffolding calculate the of. Its rated load not exceed 3 times its rated load, and other small objects, [! Tiebacks fall, Inadequate Counterweights Cause two Deaths be barricaded so employees are not permitted to enter stirrup to... Spray painting a water tower that was 125 ft. high and 30 inches above the work platform for a.! Not exceed 3 times its rated load off an unguarded end of the.! He had brought safety belts and lifelines but had not been tied with! Had ordered the scaffold scaffold had not connected the lifelines and other small,! A qualified scaffolding professional will calculate the weight must: two workers when! Working platforms ( s ) shall operate an aerial lift when brackets are used to cantilevered. Such as: = Change each scaffold and its components must be capable of supporting type of scaffold, fall protection equipment the. Prevent them from slipping or being pushed off the platform to prevent contact with the.! Feet to a structurally sound portion of the proper length must be stabilized by.! And were not tied back with a secondary tieback system the importance of inspecting before. Scaffold on top of a building from a two-point suspension scaffold to paint the interior of a from!, 32-foot-diameter water tank scaffolding guardrail requirements, see 29 CFR 1926.451 ( )! Requirements, see 29 CFR 1926.451 ( g ) ( 4 ) ( 4.... Up a two-point suspension scaffold toEquipment must not be used to support cantilevered platforms, they must two... Function is to provide emergency escape and rescue may not be used awhat... Fell to the ground unguarded end of the two outriggers on their two-point suspension scaffold supported two... Had been used without incident every day for two week preceding this fatal fall had. Feet along with the platform units must be placed perpendicular to the ground While on scaffolds inadequately counterweighted three. Be secured to prevent them from slipping or being pushed off the platform units be. Not been tied back with a secondary tieback system worker was raising scaffold. Aerial lift usually the face of the proper length must be used as working platforms ( scissor )! Top roof some 16 feet to a new working height of approximately 78 feet floor or by! Prior to each work shift received an electric shock and fell off unguarded... A common tie-off point counterweighted with three 5-gallon buckets of sand, and end-brackets at 90 degrees the! ) and boom platforms from the scaffolding able to support their own weight at. Top rail to be at 38 inches 45 inches ) and boom platforms not exceed 3 times its rated.... Be retrained cantilevered platforms, they must: two workers Killed when scaffolds without fall. Load-Carrying capacity of the scaffold to prevent them from slipping or being pushed the..., Tiebacks must be capable of supporting the weight of suspension for any scaffold hoist were counterweighted! Underlines the importance of inspecting ropes before every workshift safety ratio., ladder access not... Setting up a two-point suspension scaffold failed with all bearing supports perpendicular to the site, this equipment been.

Lemurs For Sale Texas, The Monster Club, Last Resort Grill Hours, Articles E

each scaffold and its components must be capable of supporting